Full Bathroom Remodel — Hall Bath for Family of 4
Starter Package
Sterling, VA — Countryside

Full Bathroom Remodel — Hall Bath for Family of 4

10 days

Build Time

$16,900

Final Cost

Single to double

Sinks Added

380 sq ft

Tile Installed

Project Scope

  • Full tub surround tile — subway to ceiling
  • New dual-flush toilet
  • Single vanity replaced with 60" double vanity (two sinks)
  • Herringbone penny tile floor
  • Recessed medicine cabinet x2
  • New lighting bar and exhaust fan
  • Plumbing rough-in for second sink — all included

Materials Used

Subway Tile (tub surround)Penny Tile (floor)60" Double VanityDual-Flush ToiletRecessed Medicine Cabinets

Project Story

The Challenge

Hall bathroom serving three kids — original 1994 builder finishes, tub surround cracking at seams, single vanity too small for morning rush, low-flow toilet from 1998 constantly running.

Our Approach

Replaced tub surround with subway tile to ceiling, installed dual-flush toilet, swapped single 24" vanity for double 60" vanity with two sinks, added recessed medicine cabinet, retiled floor in herringbone penny tile.

The Outcome

Ten working days. The family went from fighting over one sink to having two. The penny tile floor is now the most-photographed detail in the house. Zero issues through the first year.

Project Location

This bathroom remodel was completed in Sterling, VA — Countryside. P&L Outdoor Solutions serves homeowners across Northern Virginia and the Shenandoah Valley — including Leesburg, Ashburn, McLean, Great Falls, and more.

View all service areas
Angela & Derek T.

Angela & Derek T.

Homeowners — Sterling, VA

“Three kids, one bathroom, two sinks now. Victor completely understood the problem and solved it. The penny tile floor was his suggestion — it's the detail everyone mentions when they see it.”

We half-expected him to try to sell us a bigger project. Instead he gave us exactly what we needed for what we could spend. The bathroom works better, looks better, and cost less than we budgeted.

Final Cost$16,900
Build Timeline10 days
CompletedJanuary 2025
Contract TypeFixed Price
See similar Bathroom Remodel projects
Want results like this?

Your backyard could be next.

Same fixed-price contract. Same owner on-site every day. Same zero change orders. Victor personally visits every estimate — no salesperson, no subcontract surprises.

2-Year Written Warranty
Fixed Price — No Surprises
Owner on Site Every Day
5.0 Google Rating
Back to All Case Studies
Serving Northern Virginia & Shenandoah Valley
Leave a message — we respond within 2 hours
VP

Victor is available right now

Responds within 2 hours · No sales reps

Talk with Us